NEWPermit Search is live — three years of North Carolina permits, free to start. Search permits →

How to find deck and addition leads in Raleigh from building permits — free

Raleigh filed 884 deck, porch and addition permits in the last 12 months — about 17 a week, 70 in the last 30 days. Every one is a public record naming the address, the work and, usually, who's doing it. Here's how deck builders, remodelers and their subs find them for free, which ones are worth a call, and when it's worth paying not to.

The busiest ZIP code was 27615, with 15% of them, and the most active name on them was Feazel Roofing Company, with 22.

Last 12 months
884
A week, on average
17
Last 30 days
70
Busiest month
95
May 2026

Step 1: Search Raleigh's Permit and Development Portal (free)

The permit office's own records, straight from the source. Search for: deck, porch, screened porch and residential addition.

  1. Open the portal and choose Search (no account needed to look).
  2. Set the search to Permit, then filter by permit type (building, mechanical, electrical, plumbing) and an applied or issued date range.
  3. Page through the results; each permit opens to its address, work description and status.

Who's on a permit: A permit's page lists its contacts, often with a phone number.

Open Raleigh's Permit and Development Portal →

Step 2: Keep the permits worth a call

Does the work need a permit in North Carolina? Yes. A new deck, porch or addition is load-bearing work; replacing boards, railings or treads isn't. So these are the deck, porch and addition permits on file, and what each is worth.

  • Additions

    An addition needs a foundation, framing, a roof, windows, electrical, HVAC and finishes. The general contractor on the permit hires most of them.

  • Decks and porches

    A new deck or screened porch is often followed by electrical, lighting, a screen enclosure or an outdoor kitchen.

  • Who's building where

    For a deck builder, a permit is a job already sold. Clusters by ZIP show where homeowners are spending on outdoor space.

Step 3: Start where the work is

The ZIP codes in Raleigh with the most deck, porch and addition permits in the last 12 months.

Step 4: Know who's pulling them

The remodelers and general contractors on this list hire subs; the deck builders are your competition. Ranked by permits in the last 12 months.

Step 5: Reach out at the right time

Call the general contractor when an addition permit is issued, before framing. For decks, follow-on work is bought in the weeks after the deck is built.

DecJanFebMarAprMayJunJulAugSepOctNov
Permits by the month they were filed or issued. Nov 2026 is still in progress.

The free way, and the fast way

The permits are free either way. What costs time is finding them, one office and one search at a time.

Finding leads in Raleigh: the free ways and Pro
The office's portalTarSignal FreeTarSignal Pro
WhereOne permit office's site at a time23 North Carolina offices, one search23 offices, one search
How recentSame day, if you search every dayPermits over 30 days oldUp to today
Who's doing the workDepends on the office; phone numbers rarelyContractor and contact, on permits over 30 days oldContractor and contact on every permit
New permits sent to youNoWeekly, one ZIP codeDaily, every area
ExportRarelyNoCSV
CostFreeFree$199/month

Deck & Addition Leads in Raleigh: common questions

How do I find deck and addition leads in Raleigh for free?
From the building permits. Raleigh's Permit and Development Portal is free to search: Open the portal and choose Search (no account needed to look). TarSignal's free search has the same permits from 23 North Carolina offices in one place, with the contractor where the record names one, for permits more than 30 days old.
How many deck, porch and addition permits are filed in Raleigh?
884 in the last 12 months, about 17 a week, and 70 in the last 30 days. The busiest ZIP codes were 27615, 27612 and 27609.
Are building permits public record in North Carolina?
Yes. Permits are public records under the North Carolina Public Records Act (G.S. Chapter 132), so anyone can look them up, and the contractor named on a permit is part of the record.
Does a deck, porch or addition need a permit in Raleigh?
Yes. A new deck, porch or addition is load-bearing work; replacing boards, railings or treads isn't. That's state law (G.S. 160D-1110), so it's the same at any permit office in the state.

See this week's deck and addition leads

Permit Search has every deck, porch and addition permit filed in Raleigh, with the contractor where the record names one. Free for permits over 30 days old; Pro has them the day they're filed.

Source: TarSignal, from North Carolina public building permit records, data through October 28, 2026. Refreshed nightly. Counts include every permit type a jurisdiction files — trade permits (electrical, plumbing, mechanical) as well as building permits — so one project can appear more than once. Values are what the applicant declared, where the jurisdiction records one. We keep improving how we collect each office's permits, so a count that steps up suddenly usually means more complete records, not more construction.