Know who to call before anyone else does.
New permits for your trade, in your inbox around 6 AM. Hot leads first, then Warm, then Cold, each with the contractor to call.
Two weeks for $37
Includes all 5 products: Project Alerts, Permit Map, Permit Search, Permit Analytics and Material Leads.
Then $199/mo founding rate (ends Dec 31, 2026).
Cancel within the two weeks and you won't pay the monthly price.
18 North Carolina counties
- Alamance County
- Alexander County
- Brunswick County
- Cabarrus County
- Cumberland County
- Durham County
- Gaston County
- Guilford County
- Johnston County
- Mecklenburg County
- New Hanover County
- Onslow County
- Orange County
- Union County
- Wake County
- Buncombe County (Asheville only)
- Davidson County (High Point only)
- Randolph County (High Point only)
5 hot leads in Raleigh today
TarSignal Alerts <alerts@tarsignal.com>
Hot (5) · best score first
Hot · 86 · Contractor named
4121 Glenwood Avenue, Raleigh
Why: New build that will need roofing · No roofing permit filed yet
New single-family home · 2,400 sq ft · Issued Aug 5
+ 4 more Hot leads, each with who to call
Warm — good fits that are older, smaller or harder to reach
Cold — one line with the count
tarsignal-permits.csv · Lead column first
- 1
Pick your trades and areas
Counties, towns or ZIP codes, and the kinds of work you do.
- 2
We score every new permit
Hot, Warm or Cold for your trade, with the reason on each one.
- 3
Call the Hot ones first
The contractor's name and number are right on the lead.
Every alert, sorted into who to call first.
Each alert arrives sorted for your trade, Hot first, scored on how good a fit the job is, how recent, how big, and whether there's someone to call. The reasons are on every lead, and the same list is in your Command Center, so you know where to start.
Hot
Call this week
A project that will need your trade, nobody of your trade on it yet, and a phone or email to reach them.
Alteration / Remodel
$90,162 · New Hanover County
Why: An alteration / remodel project that will need HVAC work. No HVAC permit filed at the address yet. Value above the median for New Hanover County alteration / remodel permits. Contractor's phone on the permit.
Warm
Worth a follow-up
A good fit that's missing something: no phone or email yet, older, or a smaller job.
Addition
$1,057,301 · New Hanover County
Why: An addition project that will need roofing work. No roofing permit filed at the address yet. Value in the top quarter of New Hanover County addition permits. Contractor named, no phone or email.
Cold
Taken or not yours
Usually a permit for your own trade, which means another company already has the job, or a lead with too little to go on.
Electrical
New Hanover County
Why: An electrical permit with no contractor named on it.
Real leads from a New Hanover County alert, street addresses left off.
Free: your weekly alert, scored. Pro: every day, with the contractor and phone wherever the permit lists them.
How many leads you'll get
Measured from the emails we actually sent, not estimated: pick your trade to see the Hot, Warm and Cold leads a morning in each area.
Averages over each area's last 14 Pro morning emails (the newest Nov 27), weekends included, across all 8 areas we cover.
| Area | Hot | Warm | Cold | Hot daysMornings with a Hot lead |
|---|---|---|---|---|
| Charlotte | 12.4 | 21.1 | 153.2 | 12 of 14 |
| The Triangle | 11.2 | 31.2 | 30.5 | 14 of 14 |
| The Triad | 3.4 | 21.7 | 44.6 | 10 of 14 |
| Wilmington | 4.4 | 14.1 | 26.6 | 11 of 14 |
| Asheville | 0.8 | 0.9 | 1.7 | 4 of 14 |
| Onslow CountyNo lead here was Hot for any trade in these mornings. Hot needs a phone or email on the permit. | 0 | 7.6 | 1.1 | 0 of 14 |
| Cumberland CountyNo lead here was Hot for any trade in these mornings. Hot needs a phone or email on the permit. | 0 | 3.7 | 0.1 | 0 of 14 |
| Alexander County | 0.2 | 0.9 | 1.3 | 1 of 14 |
- Hot
- Your part of the job isn't permitted yet, it scores 70 or more out of 100 on fit, recency and value, and there's a phone or email on the permit. Call these first.
- Warm
- Open work for your trade that scores 45 or more but misses Hot: lower value or older, no phone or email yet, or a volume builder with set subs. Worth a follow-up.
- Cold
- Your part is already permitted to someone, it isn't a clear match for your trade, or it scores under 45.
How it's measured: each morning email is replayed with the alert's own rules (active permits first seen since the last email, filed or issued in the last 14 days, with a contractor or a street address) and scored for electrical by the same lead score. A permit's status is today's, and no minimum value is set, so a subscriber with filters gets fewer. Refreshed every Monday.
Then win them, without leaving TarSignal.
An alert finds the job. Your Command Center's Pipeline is where you win it: every lead you're working, what you said, when to call back, and what you've won.
01Track it
Add a lead from your Today list and move it from New to Contacted, Quoted and Won, with a note at every step. Mark a lead Called and it's in your pipeline already.
02Reach out
Get an email, a text and a call script written from the permit's own details and your business. Edit it, then send it from your own email or phone.
03Follow up
Pick a follow-up date. The ones due today come first in your pipeline and at the top of your morning email.
04Count the wins
Mark a job won, with its amount if you like, and see what TarSignal leads have won you this year.
Nothing is sent from TarSignal: drafts open in your own email or messages, so replies come straight to you.
Free shows you the job. Pro shows you who to call.
The same lead, as each plan's email shows it.
Hot · 86 · Contractor named
4121 Glenwood Avenue, Raleigh
Why: New build that will need roofing · No roofing permit filed yet
New single-family home · 2,400 sq ft · Issued Aug 5
GC: Hidden on free
- Contractor and phone hidden
- About 1 in 3 permits, Mondays only
- At most 60 permits a week
Hot · 86 · Contractor named
4121 Glenwood Avenue, Raleigh
Why: New build that will need roofing · No roofing permit filed yet
New single-family home · 2,400 sq ft · Issued Aug 5
GC: Carolina Custom Builders LLC · (919) 555-0142
- Contractor, phone and email*
- Every permit, every morning
- All 8 metros, plus a CSV of the full list
One closed job covers the rest.
Two weeks for $37, then $199/mo, for all 5 products. Most contractors earn it back on a single permit-backed project.
What's included
Sorted for your trade
Hot leads first, each with why it made the cut, then Warm, then the Cold ones as a single line.
Who to call
The contractor on the permit, with phone and email when we have them. Some offices don't record one.
All 8 metro markets
Charlotte, the Triangle, the Triad, Wilmington, Asheville, Onslow County, Cumberland County and Alexander County. Narrow by county or town, trade, permit type, status or minimum value.
A spreadsheet every morning
The full list as a CSV, up to 5,000 permits, Hot leads first. Ready for Excel or your CRM.
One list for the whole team
Send it to a shared inbox so estimators and PMs work the same leads. Ask us about team seats.
A pipeline to win them
Move each lead from New to Won in your Command Center, with notes, follow-up reminders and outreach drafted from the permit.
All of TarSignal Pro
The Permit Map, Permit Search, Permit Analytics and Material Leads come with it.
Declared value and square footage on every permit whose office publishes them.
Free vs. Pro
| Feature | Free | Pro |
|---|---|---|
| New project alerts by email | Mondays, 6 AM | Every morning, 6 AM |
| Address + permit type + description | ||
| Sorted Hot, Warm and Cold for your trade | ||
| Coverage | The areas you pick | All 8 metrosor pick your cities |
| Permits in each email | About 1 in 3 | All of them |
| GC name* | — | |
| GC phone number* | — | |
| Full list as a CSV spreadsheet, Hot leads first | — | |
| Lead pipeline: stages, notes, follow-up reminders | — | |
| Outreach drafted from each permit | — | |
| Permit Map — permits filed in the last 30 days | — | |
| Permit Search — permits filed in the last 30 days | — | |
| Permit Analytics — coverage, trade, and trend data | — | |
| Material Leads — addresses about to order materials | — |
* Where the permit names the contractor, and a phone number where the permit or the state licensing board lists one. If your areas have fewer than 25 new permits on a morning, up to three nearby counties fill the list out, and the email says which.
Common questions
What do Hot, Warm and Cold mean?
Once you've told us your trade, each alert email comes sorted Hot, then Warm, then Cold, every permit scored out of 100 for your trade: how good a fit the job is, how recent, how big for its area, and whether there's someone to reach. The reasons are on every card, the Pro spreadsheet's first column says which tier each permit is, and the same list is on your account's Today tab. Hot is 70 or more with a phone or email to call, usually a project that will need your trade with nobody of your trade on it yet. Warm is 45 or more: a good fit that's missing something, like a phone number. Cold is the rest, plus every permit that doesn't match your trade or that another company of your trade already has. A new home from a large builder (25 or more new homes in the last year) is at most Warm for a trade: those builders work with the same subs house after house, so the card says to pitch the builder for a spot on their sub list rather than bid that house. A new home is also at most Warm for an electrician, plumber, HVAC contractor or roofer where the permit office doesn't file that trade's permit separately for new homes (most offices outside Mecklenburg, Cabarrus and Greensboro, and every office for roofing). There, no trade permit on file doesn't mean nobody has the job, so the card says we can't tell. Free accounts get their weekly alert scored. Pro is scored every day and shows the contractor and phone on each lead where the permit lists them.
How do I track a lead from first call to won?
On Pro, your Command Center has a Pipeline tab. Press Add to pipeline on any lead on your Today tab (or mark it Called, which adds it as Contacted), then move it from New to Contacted, Quoted and Won, or Lost. Each lead keeps the permit's details, who to call, your notes, and a line for every stage change. Set a follow-up date on any open lead: in 2 days, next week, in 2 weeks or a date you pick. The ones due today or overdue come first in your pipeline and at the top of your Pro morning email. When you win one, mark it Won, with the job amount if you like. The top of the Pipeline tab shows what TarSignal leads have won you this year. You can also tick "TarSignal may mention this win" so we can share it, such as "a roofer in Apex won a job from a TarSignal lead"; we ask before using your name or company, and it's off unless you tick it. If Pro ends, your pipeline and notes stay readable in your account; moving leads and adding notes need Pro.
Can TarSignal write the email to the contractor?
Yes, on Pro. On any open lead in your Pipeline, press Draft outreach and you get three versions: an email, a text message and a short call script, written from the permit's own details (the address, kind of work, description, size and filing date) and the business details you fill in once under Your business on your Profile, signed with your Profile's name. A draft never uses a number that isn't in those details; if the writer's draft does, you get a plain draft built straight from them instead. Nothing is sent by TarSignal. Open in my email starts a message in your own email app, Open in Messages starts a text, or copy it. Replies come straight to you. Sending a draft moves a New lead to Contacted. Pro accounts can draft up to 40 a day.
Where do the phone numbers come from?
First from the permit record itself: the contractor of record filed with the city or county. Where the permit has no phone or email, we look it up in other official records, such as the office's own permit pages and the state contractor licensing board, and use a result only when it matches exactly one contractor. Two possible matches are skipped, not guessed. We clean and check the format of each number before it reaches your list.
Is there a free trial?
Not a free one, but monthly Pro, which includes all 5 products, starts with two weeks for $37. After that it's $199 a month, unless you cancel before the two weeks are up, and then you're not charged again. The trial is for first-time subscribers. And if Pro isn't for you, email us within 7 days of your first charge and we'll refund it in full. Monthly billing has no contract.
What if there aren't enough projects in my area?
Look before you pay: the Permit Map and Permit Search are free and show what's been filed near you. If you're still unsure, tell us your trade and area and we'll tell you honestly whether the filings there support it.
I'm not on the free list yet. Where do I start?
Start with the free weekly list: pick the areas you work, no card. When you want contractor names, phone numbers and emails (where the permit records have them), the newest permits and CSV delivery, move up to Pro.
