NEWPermit Search is live — three years of North Carolina permits, free to start. Search permits →

The Triangle: building permits and new construction

32,679 building permits were filed in the last 12 months at the 9 permit offices we read in the Triangle, and 3,368 in the last 30 days. The most common work: electrical (28%), new build (24%) and alteration / remodel (8%).

Across the region's counties, the Census counted 15,307 new single-family homes in the 12 months to August 2026, +1% on the year before, and 10,254 units in apartment and other multi-unit buildings.

Permits, last 12 months
32,679
Last 30 days
3,368
New single-family homes
15,307
12 months, region's counties (Census)
New single-family home
$450K
median construction cost on permits

Who issues building permits in the Triangle

The Triangle is the opposite of Charlotte: in Wake County, the larger towns run their own permitting. Raleigh, Cary, Apex, Morrisville, Garner, Fuquay-Varina and Wake Forest each issue permits inside their limits, and Wake County issues them for the unincorporated areas between. Knowing which side of a town line an address sits on tells you which office has its permit.

Durham is simpler. The City of Durham and Durham County share one inspections department, so a single office covers the whole county.

What each office publishes differs. Some list trade permits (electrical, mechanical, plumbing) on their own; others fold them into the building permit or don't publish them. Compare offices by the kind of work, not by raw totals.

We don't read permits from Orange, Johnston, Chatham, Franklin, Granville or Person County yet, or from the smaller Wake towns that run their own permitting, such as Holly Springs. The Census counts below cover those counties.

The permit offices we read

Each has its own page with monthly permits, what's being built, the busiest ZIP codes, the most active contractors and the latest filings.

New homes by county

Housing authorized by building permits in each county around the region, from the Census Bureau — including the counties we don't have a permit feed for yet.

CountySingle-family homesvs. year beforeUnits in 2+ unit buildingsAvg. cost per home
Wake8,340−3%6,241$290K
Johnston2,587−3%12$308K
Durham2,201+16%3,102$385K
Franklin920+22%0$306K
Chatham496−5%2$518K
Orange348+1%717$411K
Granville289+34%180$366K
Person126−9%0$347K
New housing units authorized by building permits, September 2025 through August 2026, from the U.S. Census Bureau's Building Permits Survey (released monthly; the latest is August 2026). "Vs. year before" compares single-family homes with the 12 months before that. Average cost is the construction cost declared on the permits — it leaves out land, site work and the builder's margin.

What's being permitted

Every permit filed in the last 12 months at the offices we read in the Triangle, by type of work.

  • Electrical9,070 (28%)
  • New Build7,849 (24%)
  • Alteration / Remodel2,605 (8%)
  • Deck / Porch2,100 (6%)
  • Residential1,386 (4%)
  • Mechanical / HVAC1,242 (4%)
  • Accessory Structure / ADU1,163 (4%)
  • Demolition859 (3%)
  • Garage / Carport555 (2%)
  • Fence / Retaining Wall530 (2%)

Busiest ZIP codes in the Triangle

Where the permits are. Each linked ZIP has its own page.

Most active contractors in the Triangle

Ranked by permits pulled in the last 12 months. Builders, and the trades that file their own permits.

Recent permits

The latest filings. Permit Search has every one, with the contractor behind it.

AddressTypeValueStatusDate
101 LONGSTOCK CTCary 27513Alteration / RemodelB434—In review
1106 MEDLIN DRCary 27511Deck / PorchB434$28KIn review
301 PARK YORK LNCary 27519OtherB434$12KIn review
322 WEDGEMERE STCary 27519Alteration / RemodelB434$121KIn review
109 DORCHESTER PINES CTCary 27511Alteration / RemodelB434$77KIn review
1474 BARN DOOR DRApex 27502ElectricaleResidential Electrical$2,200—
8700 STAGE FORD RDRaleigh 27615ElectricalResidential Trade Permit. Plumbing, Mechanical, or Electrical$600Submitted
2708 BANKS LAKE CTFuquay-Varina 27526Deck / PorchADDITIONS AND REMODELS$35K—
6504 ROCK SERVICE STATION RDRaleigh 27603Accessory Structure / ADUResidential Accessory Building or Structure$35KSubmitted
535 BRATTON ROCK LN WENDELLWendellNew BuildResidential - New One- and Two-Family Dwelling$270KSubmitted

The Triangle: common questions

Who issues building permits in the Triangle?
The Triangle is the opposite of Charlotte: in Wake County, the larger towns run their own permitting. Raleigh, Cary, Apex, Morrisville, Garner, Fuquay-Varina and Wake Forest each issue permits inside their limits, and Wake County issues them for the unincorporated areas between. Knowing which side of a town line an address sits on tells you which office has its permit.
How many building permits were filed in the Triangle this year?
32,679 in the last 12 months, and 3,368 in the last 30 days, across the 9 permit offices we read: Wake County, Raleigh, Durham, Cary, Morrisville, Garner, Fuquay-Varina, Apex and Wake Forest. That counts every permit type each office publishes, trade permits included, so one project can appear more than once.
Where are the most new homes being built around the Triangle?
Wake County: 8,340 new single-family homes authorized from September 2025 through August 2026, by the Census count. Across the 8 counties we track here it was 15,307, 1% more than the year before.
What does a new home cost to build in the Triangle?
The median construction cost declared on new single-family home permits in the offices we read was $450K over the last 12 months, and $324K for townhomes. That's the builder's declared cost of construction — it leaves out the land, site work and the builder's margin, so it runs well below a sale price.

Get the permits, not just the totals

Permit Search has every permit from the offices we read in the Triangle: the address, the contractor behind it and the permit history of each property. Or get new permits in your ZIP codes emailed to you.

Source: TarSignal, from North Carolina public building permit records, data through October 5, 2026. Refreshed nightly. Counts include every permit type a jurisdiction files — trade permits (electrical, plumbing, mechanical) as well as building permits — so one project can appear more than once. Values are what the applicant declared, where the jurisdiction records one. We keep improving how we collect each office's permits, so a count that steps up suddenly usually means more complete records, not more construction.