Building permits and new construction in Garner, NC
1,084 permits were filed in Garner in the last 12 months, and 77 in the last 30 days. The most common work: new build (48%), residential (8%) and electrical (5%). 523 were for new construction.
The Town of Garner issues building permits inside town limits. Part of our guide to the Triangle.
- Last 30 days
- 77
- Last 90 days
- 295
- Last 12 months
- 1,084
- Declared value
- $0
- last 12 months
How to search Garner building permits by address
Garner's SmartGov portal is the official record, free to search.
- Use Advanced Search: pick the application type and a date range.
- The results list each permit's address, type and status.
- Open one for its details.
Who's on a permit: Applications name the contractor on most permits.
Open Garner's SmartGov portal →Or search every office at once in TarSignal →
How Garner compares
- Garner is the 22nd busiest of the 26 permit offices TarSignal reads, but ranks 13th for new homes: more of its permits are for new houses than its size suggests.
- Electrical, plumbing and HVAC permits are only 5% of its permits, against 48% at the typical office, so its totals run lower than an office that files each trade on its own. Compare offices by the kind of work, not by raw totals.
- Work that's more common here than at most offices: new homes (48% of its permits, against 11% at the typical office).
- 345 different contractors pulled permits here in the last 12 months, and the ten busiest pulled 41% of the permits that name one: a few firms do a large share of the work.
Permits by month
What's being permitted
Every permit filed in Garner in the last 12 months, by type of work.
- New Build523 (48%)
- Residential91 (8%)
- Electrical57 (5%)
- Commercial43 (4%)
- Demolition9 (1%)
- Other361 (33%)
Permit types in Garner's records
10 permit types appear in Garner's records in the last 12 months. These are the busiest, written as the office writes them: the names to look for in its portal.
| Permit type | Last 12 months |
|---|---|
| Residential New Building or Structure Permit | 501 |
| Trades or Change Out Permit | 339 |
| Residential Existing Building or Structures Permit | 91 |
| Solar, EV or Generator | 57 |
| Commercial Existing Building or Structure Permit | 43 |
| Commercial New Building Permit | 22 |
| Construction Permit without Drawings | 9 |
| Demolition Permit | 9 |
Most active contractors in Garner
Ranked by permits pulled in the last 12 months.
| Contractor | Last 12 months | Last 90 days |
|---|---|---|
| Pulte Home Company, LLC | 89 | 6 |
| Windsor SFR, LLC | 84 | 0 |
| Clayton Properties Group, Inc. | 68 | 12 |
| Lennar | 51 | 14 |
| Ryan Homes | 43 | 13 |
| Mattamy Homes | 34 | 8 |
| Mandolin HVAC | 26 | 14 |
| Eastwood Homes | 20 | 0 |
| Taylor Morrison | 18 | 6 |
| McKinley Homes NC LLC | 16 | 0 |
| KB Home | 15 | 8 |
| Meritage Homes | 15 | 0 |
Recent permits in Garner
The newest of the 77 permits filed with Garner in the last 30 days.
| Address | Type | Value | Status | Date |
|---|---|---|---|---|
| 130 ANNARON CTRaleigh | OtherTrades or Change Out Permit | — | Issued | |
| 1400 Mechanical Blvd STE 120Garner | OtherTrades or Change Out Permit | — | Issued | |
| 261 GOLDEN TRACE DRGarner | New BuildResidential New Building or Structure Permit | — | Issued | |
| 1527 HALL BLVDGarner | OtherTrades or Change Out Permit | — | Issued | |
| 104 CROSSPINE DRRaleigh | OtherTrades or Change Out Permit | — | Issued |
72 more permits filed in Garner in the last 30 days
Pro names the contractor on nearly all, with a phone number on a few.
Pro includes all 5 products: $199/mo founding rate (ends Dec 31, 2026), then $299/mo.
Garner building permits: common questions
- Why do Garner's monthly permit numbers jump in May 2026?
- Because that's when our collection of Garner's permits improved: better collection or updated filters let more of its permits into our records, around 128 a month from then on, up from around 37. The jump reflects more complete records, not a sudden rise in construction.
- Who issues building permits in Garner?
- The Town of Garner issues building permits inside town limits.
- Do Garner's permit records show whether the work was finished?
- Garner's records rarely mark a permit finished: none of its permits filed 6 to 12 months ago read complete, so a permit still marked Issued here may well be done.
Garner permits by trade
Trades with 50 or more permits here in the last year have their own page.
More of the Triangle
Garner is part of our guide to the Triangle: who issues permits there, new homes by county and the region's busiest builders. Or start from the North Carolina permit guide.
Get the permits, not just the totals
Permit Search has each of Garner's permits by address, with the contractor named on 100% of them, and every property's permit history. A free weekly email sends the new ones.
TarSignal Pro: new permits the day they're filed
Daily alerts across every metro, with the contractor's phone and email where the permit lists them, plus CSV export. Pro includes all 5 products: $199/mo founding rate (ends Dec 31, 2026), then $299/mo.
Source: TarSignal, from North Carolina public building permit records, data through November 25, 2026. Refreshed nightly. Garner's records rarely mark a permit finished: none of its permits filed 6 to 12 months ago read complete, so a permit still marked Issued here may well be done. Its records carry no job value, so its permits have no dollar figure.
