HVAC permits in North Carolina: every change-out is on the record
For HVAC contractors
Unlike a reroof, an HVAC replacement in North Carolina needs a permit at any price. That makes mechanical permits the most complete record there is of who is replacing systems, where and how often — wherever an office publishes them.
- Permits, last 12 months
- 68,310
- Last 90 days
- 18,962
- Last 30 days
- 5,672
- Contractors on the list
- 12
- most active, below
When HVAC work needs a permit in North Carolina
The $40,000 exemption in G.S. 160D-1110 doesn't cover heating and air conditioning: adding or replacing HVAC equipment, or changing a system's design, needs a mechanical permit whatever it costs. A like-for-like change-out is a permitted job, the same as a new install.
Who can see those permits depends on the office. Mecklenburg, Cabarrus and Union counties, Greensboro and Guilford County publish mechanical permits as records of their own, naming the contractor who pulled them. Several Triangle offices file trade work inside the building permit or don't publish it, so mechanical counts there run low — read the numbers below office by office.
Mechanical work also follows other permits. A new home gets a system, an addition usually extends one, and a commercial up-fit gets new rooftop units — and those permits arrive weeks or months before the mechanical permit does.
The permits worth watching
Change-outs
Mechanical permits on existing homes are replacements. Where one contractor files a run of them, you're looking at a competitor's territory.
New homes
Each one needs a system, and the builder picks the HVAC sub — often for a whole subdivision at once.
Additions and remodels
More square footage means a bigger system or a new zone. The homeowner picks the contractor, often weeks after the building permit.
Commercial up-fits
A tenant fit-out usually means new or relocated rooftop units and ductwork: larger jobs, with a GC to call.
Where the work is
68,310 mechanical (HVAC) permits in the last 12 months, by the permit office that issued them and by ZIP code. Each links to its own page.
- Charlotte & Mecklenburg County32,772
- Greensboro7,349
- Cabarrus County5,576
- Wake County4,292
- Brunswick County3,518
- Wilmington & New Hanover County2,131
- Gaston County1,977
- Johnston County1,846
- Onslow County1,785
- Cary1,459
- Cumberland County1,337
- Union County1,091
- Alamance County826
- Guilford County698
- High Point439
- Alexander County245
- Wake Forest206
- Apex202
- Orange County201
- Fuquay-Varina148
- Asheville105
- Morrisville49
- Raleigh38
- Durham20
HVAC permits by city
Every permit office with 50 or more of these permits in the last year has its own page: counts by month, the busiest ZIP codes, who's pulling them and recent filings.
- Charlotte & Mecklenburg County32,772 permits in 12 months
- Greensboro7,349 permits in 12 months
- Cabarrus County5,576 permits in 12 months
- Wake County4,292 permits in 12 months
- Brunswick County3,518 permits in 12 months
- Wilmington & New Hanover County2,131 permits in 12 months
- Gaston County1,977 permits in 12 months
- Johnston County1,846 permits in 12 months
- Onslow County1,785 permits in 12 months
- Cary1,459 permits in 12 months
- Cumberland County1,337 permits in 12 months
- Union County1,091 permits in 12 months
- Alamance County826 permits in 12 months
- Guilford County698 permits in 12 months
- High Point439 permits in 12 months
- Alexander County245 permits in 12 months
- Wake Forest206 permits in 12 months
- Apex202 permits in 12 months
- Orange County201 permits in 12 months
- Fuquay-Varina148 permits in 12 months
- Asheville105 permits in 12 months
Who's doing the work
The contractors pulling the most of these permits in the last 12 months — your competitors, or the builders and GCs worth a call.
| Contractor | Last 12 months | Last 90 days |
|---|---|---|
| Champion Residential LLC, DBA Morris Jenkins | 2,643 | 689 |
| Brothers Air, Heat & Plumbing | 1,465 | 349 |
| Ars | 773 | 149 |
| Formula Air HVAC LLC | 717 | 193 |
| Mandolin HVAC | 702 | 182 |
| Bradham Comfort Services | 615 | 191 |
| Robin Mcclintock | 573 | 119 |
| Ryan Homes | 571 | 84 |
| Piedmont Natural Gas | 563 | 156 |
| Dilling Heating, Cooling, Plumbing & Electrical | 539 | 114 |
| Acosta Inc. | 496 | 105 |
| MAJ Permits Inc. | 489 | 77 |
Recent permits
A sample from 30 or more days ago. Permit Search and the daily email have them as they're filed.
| Address | Type | Value | Status | Date |
|---|---|---|---|---|
| 5528 FLOWERING DOGWOOD LNCharlotte 28270 | Mechanical / HVACMechanical | $6,217 | Completed | |
| 9541 LITTLE KERN LNCharlotte 28278 | Mechanical / HVACMechanical | $500 | Issued | |
| 6005 ALENA DRMatthews 28105 | Mechanical / HVACMechanical | — | In review | |
| 2552 Willowbrook DrStallings | Mechanical / HVAC200 - Residential Mechanical | — | Issued | |
| 4824 WOODS EDGE INDIVIDUALWilmington 28409 | Mechanical / HVACNHC Residential Trade Permit | — | Submitted |
5,672 more permits filed in North Carolina in the last 30 days
Pro names the contractor on most, with a phone number on some.
Pro includes all 5 products: $199/mo founding rate (ends Dec 31, 2026), then $299/mo.
How to work the list
- 01
Map the change-outs
Mechanical permits on existing homes show where systems are being replaced. The ZIPs with the most are where the replacement cycle is running.
- 02
Know your competition
The contractor table shows who pulls the most permits; each contractor's page shows where they work and what else they file.
- 03
Get ahead of the system
Watch new-home, addition and up-fit permits in your ZIPs. They tell you where mechanical work is coming before anyone files for it.
More reading
HVAC permits in North Carolina: common questions
- Do you need a permit to replace an HVAC system in North Carolina?
- Yes. The $40,000 exemption in G.S. 160D-1110 doesn't cover adding or replacing heating or air-conditioning equipment, so a change-out needs a mechanical permit like a new install does. That makes mechanical permits close to a complete record of HVAC replacements wherever an office publishes them.
- How many HVAC permits are filed in North Carolina?
- 68,310 mechanical permits in the last 12 months across the offices we read. Most were filed in Mecklenburg County (32,772), Greensboro (7,349) and Cabarrus County (5,576). Not every office publishes trade permits separately, so the count leans toward those that do — Mecklenburg, Cabarrus and Greensboro among them.
- Who pulls the most mechanical (HVAC) permits in North Carolina?
- By permits in the last 12 months: Champion Residential LLC, DBA Morris Jenkins, Brothers Air, Heat & Plumbing and Ars. The table above has the top twelve, each linked to its own page where it has one.
More guides
- North Carolina building permits: the guide
- Roofing permits in North Carolina
- Solar permits in North Carolina
- Building permit data for general contractors
- Electrical permits in North Carolina
- Plumbing permits in North Carolina
- Demolition permits in North Carolina
- Pool and spa permits in North Carolina
- Deck, porch and addition permits in North Carolina
- Commercial upfit permits in North Carolina
- Fire alarm and sprinkler permits in North Carolina
- Foundation and concrete permits in North Carolina
- Window, door and siding permits in North Carolina
- The Charlotte region: building permits guide
- The Triangle: building permits guide
- The Triad: building permits guide
- Wilmington and the Cape Fear region: building permits guide
Get these permits as they're filed
Pick your area and the first list of new permits lands in your inbox right away, then every Monday morning. Free, no card. Pro adds daily alerts and the contractor's contact details.
TarSignal Pro: new permits the day they're filed
Daily alerts across every metro, with the contractor's phone and email where the permit lists them, plus CSV export. Pro includes all 5 products: $199/mo founding rate (ends Dec 31, 2026), then $299/mo.
Source: TarSignal, from North Carolina public building permit records, data through November 28, 2026. Refreshed nightly. Counts include every permit type a jurisdiction files — trade permits (electrical, plumbing, mechanical) as well as building permits — so one project can appear more than once. Values are what the applicant declared, where the jurisdiction records one. We keep improving how we collect each office's permits, so a count that steps up suddenly usually means more complete records, not more construction.
