NEWPermit Search is live — three years of North Carolina permits, free to start. Search permits →

How to find HVAC leads in Apex from building permits — free

Apex filed 95 HVAC (mechanical) permits in the last 12 months — about 1.8 a week, 87 in the last 30 days. Every one is a public record naming the address, the work and, usually, who's doing it. Here's how HVAC contractors find them for free, which ones are worth a call, and when it's worth paying not to.

Last 12 months
95
A week, on average
1.8
Last 30 days
87
Busiest month
95
October 2026

Step 1: Search Apex's eSuite permit search (free)

The permit office's own records, straight from the source. Search for: mechanical, and new residential dwellings.

  1. Pick a permit type in Advanced Search and run it.
  2. Each result opens to the permit's address, work and status.
  3. The search shows at most 50 permits per type, the oldest first, so recent permits often don't appear in it.

Who's on a permit: The public pages don't show the contractor.

Open Apex's eSuite permit search →

Step 2: Keep the permits worth a call

Does the work need a permit in North Carolina? Yes. Adding or replacing heating or air-conditioning equipment always needs a permit. So these are the HVAC (mechanical) permits on file, and what each is worth.

  • New construction

    A new-home or commercial building permit means a system to design and install. The builder or general contractor named on it chooses the mechanical sub.

  • Change-outs

    Every replacement in North Carolina needs a mechanical permit, so the record is close to complete. A change-out is a job someone else already won, but the pattern shows which neighborhoods' systems are failing and who's winning them.

  • Commercial upfits

    A tenant upfit almost always moves ductwork or adds equipment. The general contractor on the building permit is the call.

Step 3: Start where the work is

The ZIP codes in Apex with the most HVAC (mechanical) permits in the last 12 months.

Step 5: Reach out at the right time

On new construction, reach the builder in the weeks after the building permit is issued, before rough-in. For replacements, the permit follows the sale, so use it to find streets, not jobs.

DecJanFebMarAprMayJunJulAugSepOctNov
Permits by the month they were filed or issued. Nov 2026 is still in progress.About the jump in October 2026: that's when our collection of these permits improved, so more permits reach our records from then on (around 95 a month, up from around 0). It reflects more complete records, not more construction, so compare months on either side of it with care.

The free way, and the fast way

The permits are free either way. What costs time is finding them, one office and one search at a time.

Finding leads in Apex: the free ways and Pro
The office's portalTarSignal FreeTarSignal Pro
WhereOne permit office's site at a time23 North Carolina offices, one search23 offices, one search
How recentSame day, if you search every dayPermits over 30 days oldUp to today
Who's doing the workDepends on the office; phone numbers rarelyContractor and contact, on permits over 30 days oldContractor and contact on every permit
New permits sent to youNoWeekly, one ZIP codeDaily, every area
ExportRarelyNoCSV
CostFreeFree$199/month

HVAC Leads in Apex: common questions

How do I find HVAC leads in Apex for free?
From the building permits. Apex's eSuite permit search is free to search: Pick a permit type in Advanced Search and run it. TarSignal's free search has the same permits from 23 North Carolina offices in one place, with the contractor where the record names one, for permits more than 30 days old.
How many HVAC (mechanical) permits are filed in Apex?
95 in the last 12 months, about 1.8 a week, and 87 in the last 30 days. The busiest ZIP codes were 27502, 27523 and 27539.
Are building permits public record in North Carolina?
Yes. Permits are public records under the North Carolina Public Records Act (G.S. Chapter 132), so anyone can look them up, and the contractor named on a permit is part of the record.
Does HVAC work need a permit in Apex?
Yes. Adding or replacing heating or air-conditioning equipment always needs a permit. That's state law (G.S. 160D-1110), so it's the same at any permit office in the state.

See this week's HVAC leads

Permit Search has every HVAC (mechanical) permit filed in Apex, with the contractor where the record names one. Free for permits over 30 days old; Pro has them the day they're filed.

Source: TarSignal, from North Carolina public building permit records, data through October 28, 2026. Refreshed nightly. Counts include every permit type a jurisdiction files — trade permits (electrical, plumbing, mechanical) as well as building permits — so one project can appear more than once. Values are what the applicant declared, where the jurisdiction records one. We keep improving how we collect each office's permits, so a count that steps up suddenly usually means more complete records, not more construction.