NEWPermit Search is live — three years of North Carolina permits, free to start. Search permits →

How to find solar leads in Durham from building permits — free

Durham filed 211 solar permits in the last 12 months — about 4.1 a week, 22 in the last 30 days. Every one is a public record naming the address, the work and, usually, who's doing it. Here's how solar installers find them for free, which ones are worth a call, and when it's worth paying not to.

The busiest ZIP code was 27705, with 22% of them, and the most active name on them was Southern Energy Management, Inc, with 56.

Last 12 months
211
A week, on average
4.1
Last 30 days
22
Busiest month
24
April 2026

Step 1: Search the Durham City-County Land Development Office site (free)

The permit office's own records, straight from the source. Search for: electrical (solar is filed as electrical work).

  1. Search permits by address or permit number, or browse by date where the search allows.
  2. Each permit lists its type, status and inspections.
  3. Durham also posts monthly construction activity reports on durhamnc.gov.

Who's on a permit: Permits name the contractor; phone numbers aren't shown.

Open the Durham City-County Land Development Office site →

Step 2: Keep the permits worth a call

Does the work need a permit in North Carolina? Yes. Every install adds electrical equipment, so it needs at least an electrical permit. So these are the solar permits on file, and what each is worth.

  • Who's installing where

    A solar permit means the sale already happened, so it's market intelligence more than a lead: which installers win which ZIP codes, and how many systems go up a month.

  • New homes

    Builders offering solar or solar-ready wiring choose an installer per community. The new-home permits show which builders are building where.

  • Commercial roofs

    Commercial building and re-roof permits mark large flat roofs — the best sites for commercial solar.

Step 3: Start where the work is

The ZIP codes in Durham with the most solar permits in the last 12 months.

Step 4: Know who's pulling them

The installers on this list are your competition; the builders filing new-home permits are partners worth a call. Ranked by permits in the last 12 months.

Step 5: Reach out at the right time

Call builders when a community's first permits are filed, before they've picked an installer for it.

DecJanFebMarAprMayJunJulAugSepOctNov
Permits by the month they were filed or issued. Nov 2026 is still in progress.

The free way, and the fast way

The permits are free either way. What costs time is finding them, one office and one search at a time.

Finding leads in Durham: the free ways and Pro
The office's portalTarSignal FreeTarSignal Pro
WhereOne permit office's site at a time23 North Carolina offices, one search23 offices, one search
How recentSame day, if you search every dayPermits over 30 days oldUp to today
Who's doing the workDepends on the office; phone numbers rarelyContractor and contact, on permits over 30 days oldContractor and contact on every permit
New permits sent to youNoWeekly, one ZIP codeDaily, every area
ExportRarelyNoCSV
CostFreeFree$199/month

Solar Leads in Durham: common questions

How do I find solar leads in Durham for free?
From the building permits. The Durham City-County Land Development Office site is free to search: Search permits by address or permit number, or browse by date where the search allows. TarSignal's free search has the same permits from 23 North Carolina offices in one place, with the contractor where the record names one, for permits more than 30 days old.
How many solar permits are filed in Durham?
211 in the last 12 months, about 4.1 a week, and 22 in the last 30 days. The busiest ZIP codes were 27705, 27703 and 27701.
Are building permits public record in North Carolina?
Yes. Permits are public records under the North Carolina Public Records Act (G.S. Chapter 132), so anyone can look them up, and the contractor named on a permit is part of the record.
Does solar work need a permit in Durham?
Yes. Every install adds electrical equipment, so it needs at least an electrical permit. That's state law (G.S. 160D-1110), so it's the same at any permit office in the state.

Related

The numbers behind this guide, with recent permits: Solar permits in Durham. Every permit in the area: building permits in Durham.

Solar Leads in other places

See this week's solar leads

Permit Search has every solar permit filed in Durham, with the contractor where the record names one. Free for permits over 30 days old; Pro has them the day they're filed.

Source: TarSignal, from North Carolina public building permit records, data through October 28, 2026. Refreshed nightly. Counts include every permit type a jurisdiction files — trade permits (electrical, plumbing, mechanical) as well as building permits — so one project can appear more than once. Values are what the applicant declared, where the jurisdiction records one. We keep improving how we collect each office's permits, so a count that steps up suddenly usually means more complete records, not more construction.