On June 15, 2026, JetZero broke ground on a $4.7 billion aircraft factory at Piedmont Triad International Airport in Greensboro. A groundbreaking isn't a building permit, though, and for the contractors and suppliers who will do the work, the difference matters. This article sorts North Carolina's largest projects by where each one stands in the permit record: cleared to build, filed and waiting, or announced with little or nothing permitted yet.
$308.2M
Omni Raleigh hotel: the largest building permit filed in the last 12 months in any office TarSignal reads. Issued July 10, 2026.
$158.5M
Origin 3 tenant upfit at Spark LS in Morrisville, in review since September 22, 2026
337 days
How long RDU's $83.0 million Terminal 2 north expansion package has been in review at Wake County
$4.7B
JetZero's announced Greensboro plant. No permit for the factory building has been filed yet.
Quick answers
What are the largest construction projects in North Carolina right now?
By announced investment, JetZero's $4.7 billion aircraft plant in Greensboro and Novo Nordisk's $4.1 billion fill-finish plant in Clayton. By the value on a single building permit filed in the last 12 months, the Omni Raleigh hotel ($308.2 million), followed by Spark LS's Origin 3 upfit in Morrisville ($158.5 million, still in review) and the shell of Digital Realty's west Charlotte data center campus ($150.3 million).
Has JetZero started construction in Greensboro?
JetZero broke ground on June 15, 2026. ENR reported that mass grading was expected to begin by August or September and continue for about a year before major vertical construction. As of November 3, 2026, no permit for the factory building appears in the City of Greensboro's or Guilford County's records. The City of Greensboro has issued permits for a $13 million office renovation at 725 N Regional Rd, where a July mechanical permit names Jet Zero.
When will the Omni hotel in Raleigh open?
ABC11 reported that Omni expects the work to be completed by the fourth quarter of 2028. Construction started in February 2026, and the City of Raleigh issued the hotel's $308.2 million building permit on July 10, 2026, naming Brasfield & Gorrie.
What is being built at Spark LS in Morrisville?
In December 2025 the campus's owners announced leases of more than 1.27 million sq ft to an undisclosed manufacturer: upfits of more than 400,000 sq ft of existing buildings, starting in early 2026, and a new 866,000 sq ft facility with structured parking. Morrisville has issued upfit permits for the Origin 1 and Origin 2 buildings, and a $158.5 million upfit for Origin 3 is in review.
What does 'In Review' mean on a building permit?
The office has the application and its plan reviewers haven't approved it yet. Work covered by that permit can't start. One exception to watch: the City of Raleigh's record for the Omni hotel shows an issue date of July 10, 2026, while its current status reads In Review, so check the issue date as well as the status.
Cleared to build: the largest permits already issued
These projects have their main building permits, so the general contractor is named and the work is buying trades and materials. The table lists each one's largest permit. Where an office records several big permits for one job, the note says so.
Omni Raleigh hotel (29 stories, 600 rooms)
- Place
- 615 S Salisbury St, Raleigh
- Value
- $308.2 million
- Issued
- Jul 10, 2026
- Builder named
- Brasfield & Gorrie
Digital Realty CLT13 data center campus
- Place
- 9505 Lakebrook Rd, Charlotte
- Value
- $494.4 million on 65 permits; shell and powered base building $150.3 million
- Issued
- Jan 7 – Oct 23, 2026
- Builder named
- Brasfield & Gorrie
North Mecklenburg High School, main building
- Place
- 11201 Old Statesville Rd, Huntersville
- Value
- $134.1 million
- Issued
- Jan 21, 2026
- Builder named
- Not named on the permit
Manufacturing fit-out and QC lab
- Place
- 2000 Science Dr, Morrisville
- Value
- $110.7 million on two permits ($75.2M and $35.5M)
- Issued
- Aug 21 and Sep 30, 2026
- Builder named
- Arcadis APM Group
Charlotte Hornets PEC, shell and upfit
- Place
- 150 N Caldwell St, Charlotte
- Value
- $70.3 million shell; $24.8 million upfit
- Issued
- Mar 30 and Jul 7, 2026
- Builder named
- Gilbane Building Company
Charlotte-Mecklenburg Board of Education building
- Place
- 700 E Martin Luther King Jr Blvd, Charlotte
- Value
- $97.9 million (401,350 sq ft)
- Issued
- Apr 9, 2026
- Builder named
- Rodgers Builders
Lenovo Center, second phase of alterations
- Place
- 1400 Edwards Mill Rd, Raleigh
- Value
- $89.1 million
- Issued
- Jun 18, 2026
- Builder named
- Gensler (named on the permit)
Spark LS: Origin 1, Origin 2 and Project Roanoke Parking Deck 2
- Place
- Spark View Dr and McCrimmon Pkwy, Morrisville
- Value
- $87.9 million on three permits
- Issued
- Aug 28 – Sep 18, 2026
- Builder named
- Brasfield & Gorrie
Lindley Elementary (new 3-story school)
- Place
- 2700 Camden Rd, Greensboro
- Value
- $68.3 million
- Issued
- Jun 3, 2026
- Builder named
- The Christman Company
- Place
- 1915 Harris Dr, Greensboro
- Value
- $61.4 million
- Issued
- Mar 17, 2026
- Builder named
- James R. Vannoy & Sons
Gastonia Industrial (463,200 sq ft on 69.2 acres)
- Place
- 2550 Jenkins Dairy Rd, Gaston County
- Value
- $59.7 million
- Issued
- Feb 5, 2026
- Builder named
- Not listed (Gaston County lists no contractors)
Siemens Energy main office building
- Place
- 5101 Westinghouse Blvd, Charlotte
- Value
- $22.6 million (40,505 sq ft)
- Issued
- Aug 25, 2026
- Builder named
- Messer Construction
| Project | Place | Value | Issued | Builder named |
|---|---|---|---|---|
| Omni Raleigh hotel (29 stories, 600 rooms) | 615 S Salisbury St, Raleigh | $308.2 million | Jul 10, 2026 | Brasfield & Gorrie |
| Digital Realty CLT13 data center campus | 9505 Lakebrook Rd, Charlotte | $494.4 million on 65 permits; shell and powered base building $150.3 million | Jan 7 – Oct 23, 2026 | Brasfield & Gorrie |
| North Mecklenburg High School, main building | 11201 Old Statesville Rd, Huntersville | $134.1 million | Jan 21, 2026 | Not named on the permit |
| Manufacturing fit-out and QC lab | 2000 Science Dr, Morrisville | $110.7 million on two permits ($75.2M and $35.5M) | Aug 21 and Sep 30, 2026 | Arcadis APM Group |
| Charlotte Hornets PEC, shell and upfit | 150 N Caldwell St, Charlotte | $70.3 million shell; $24.8 million upfit | Mar 30 and Jul 7, 2026 | Gilbane Building Company |
| Charlotte-Mecklenburg Board of Education building | 700 E Martin Luther King Jr Blvd, Charlotte | $97.9 million (401,350 sq ft) | Apr 9, 2026 | Rodgers Builders |
| Lenovo Center, second phase of alterations | 1400 Edwards Mill Rd, Raleigh | $89.1 million | Jun 18, 2026 | Gensler (named on the permit) |
| Spark LS: Origin 1, Origin 2 and Project Roanoke Parking Deck 2 | Spark View Dr and McCrimmon Pkwy, Morrisville | $87.9 million on three permits | Aug 28 – Sep 18, 2026 | Brasfield & Gorrie |
| Lindley Elementary (new 3-story school) | 2700 Camden Rd, Greensboro | $68.3 million | Jun 3, 2026 | The Christman Company |
| Sumner Elementary | 1915 Harris Dr, Greensboro | $61.4 million | Mar 17, 2026 | James R. Vannoy & Sons |
| Gastonia Industrial (463,200 sq ft on 69.2 acres) | 2550 Jenkins Dairy Rd, Gaston County | $59.7 million | Feb 5, 2026 | Not listed (Gaston County lists no contractors) |
| Siemens Energy main office building | 5101 Westinghouse Blvd, Charlotte | $22.6 million (40,505 sq ft) | Aug 25, 2026 | Messer Construction |
- Omni Raleigh hotel$308.2M
- Digital Realty CLT13 (shell + PBB)$150.3M
- North Mecklenburg High School$134.1M
- CMS building, 700 E MLK Jr Blvd$97.9M
- Lenovo Center alterations$89.1M
- 2000 Science Dr fit-out$75.2M
- Charlotte Hornets PEC shell$70.3M
- Lindley Elementary$68.3M
- Sumner Elementary$61.4M
- Gastonia Industrial$59.7M
Values are Millions of dollars on the largest permit.
The Omni shows how far site work can run ahead of the building permit. ABC11 reported on February 17, 2026, that crews were ripping up the parking lot on the site, and the city issued a permit for construction trailers on March 5. The $308.2 million building permit, filed December 5, 2025, was issued 217 days later. A permit for the foundation of the second tower crane followed on August 12.
For a sub, the issued list is where the buying is. The general contractor on each of these jobs is choosing trades now, and the trade permits that follow name who won.
Filed and waiting: big permits still in review
These permits are filed and not yet issued. The applicant and builder are known, but the permitted work can't start. Days waiting are counted to November 4, 2026.
Origin 3 tenant upfit, Spark LS (956,620 sq ft)
- Place
- 4773 McCrimmon Pkwy, Morrisville
- Value
- $158.5 million
- Filed
- Sep 22, 2026
- Status, days waiting
- In Review, 43 days
- Builder named
- Brasfield & Gorrie
RDU Terminal 2 north expansion, design package 1D
- Place
- RDU airport, Wake County
- Value
- $83.0 million
- Filed
- Dec 2, 2025
- Status, days waiting
- In Review, 337 days
- Builder named
- Balfour Beatty
224-unit apartments, two buildings
- Place
- 1420 Garner Rd, Raleigh
- Value
- $48.0 million
- Filed
- Oct 26, 2026
- Status, days waiting
- Submitted, 9 days
- Builder named
- Southway Builders
High Point Electric Operations Facility
- Place
- 205 Model Farm Rd, High Point
- Value
- $43.5 million
- Filed
- Sep 28, 2026
- Status, days waiting
- Additional Info Required, 37 days
- Builder named
- Not named
Gaston College Health Science Education and Simulation Center
- Place
- 600 Tower Blvd, Gaston County
- Value
- $42.8 million
- Filed
- Oct 6, 2026
- Status, days waiting
- In Review, 29 days
- Builder named
- Not listed (Gaston County lists no contractors)
RDU Terminal 2 airside restrooms (24, Concourses C and D)
- Place
- RDU airport, Wake County
- Value
- $28.9 million
- Filed
- Jun 4, 2026
- Status, days waiting
- In Review, 153 days
- Builder named
- New South Construction
- Place
- 115 Byrum St, Cary
- Value
- $28.0 million
- Filed
- Jun 18, 2026
- Status, days waiting
- In Plan Check, 139 days
- Builder named
- Not named
Raleigh Police Department Evidence Facility
- Place
- 8120 Battle Bridge Rd, Wake County
- Value
- $26.0 million
- Filed
- Aug 3, 2026
- Status, days waiting
- In Review, 93 days
- Builder named
- No company named
Medical office building, shell and core
- Place
- 3800 Barrett Dr, Raleigh
- Value
- $24.6 million
- Filed
- Jul 10, 2026
- Status, days waiting
- In Review, 117 days
- Builder named
- Barnhill Building Group
| Project | Place | Value | Filed | Status, days waiting | Builder named |
|---|---|---|---|---|---|
| Origin 3 tenant upfit, Spark LS (956,620 sq ft) | 4773 McCrimmon Pkwy, Morrisville | $158.5 million | Sep 22, 2026 | In Review, 43 days | Brasfield & Gorrie |
| RDU Terminal 2 north expansion, design package 1D | RDU airport, Wake County | $83.0 million | Dec 2, 2025 | In Review, 337 days | Balfour Beatty |
| 224-unit apartments, two buildings | 1420 Garner Rd, Raleigh | $48.0 million | Oct 26, 2026 | Submitted, 9 days | Southway Builders |
| High Point Electric Operations Facility | 205 Model Farm Rd, High Point | $43.5 million | Sep 28, 2026 | Additional Info Required, 37 days | Not named |
| Gaston College Health Science Education and Simulation Center | 600 Tower Blvd, Gaston County | $42.8 million | Oct 6, 2026 | In Review, 29 days | Not listed (Gaston County lists no contractors) |
| RDU Terminal 2 airside restrooms (24, Concourses C and D) | RDU airport, Wake County | $28.9 million | Jun 4, 2026 | In Review, 153 days | New South Construction |
| Avalon Cary, Building B | 115 Byrum St, Cary | $28.0 million | Jun 18, 2026 | In Plan Check, 139 days | Not named |
| Raleigh Police Department Evidence Facility | 8120 Battle Bridge Rd, Wake County | $26.0 million | Aug 3, 2026 | In Review, 93 days | No company named |
| Medical office building, shell and core | 3800 Barrett Dr, Raleigh | $24.6 million | Jul 10, 2026 | In Review, 117 days | Barnhill Building Group |
RDU is a case where construction and review run side by side. ABC11 reported that the airport's $2.5 billion Transform RDU program began at Terminal 2 with a temporary wall that will stay up for two years. Meanwhile, Wake County's record for the $83.0 million north expansion package has read In Review since December 2, 2025. Big programs are permitted in packages, so one package waiting doesn't mean the site is idle.
Origin 3 is the one to watch in Morrisville. It's the largest permit waiting anywhere in our records, and its builder is already working next door on Origin 1 and Origin 2.
Announced: the biggest numbers, and what's permitted so far
The largest announcements in the state run into the billions. In the permit record, each one is at a different stage.
JetZero aircraft plant, Piedmont Triad International Airport, Greensboro
- Announced
- $4.7 billion and 14,500 jobs (NC Commerce, June 2025 and June 15, 2026)
- Timeline given
- Groundbreaking June 15, 2026; mass grading for about a year from August or September, then major vertical construction (ENR)
Novo Nordisk fill-finish plant, Clayton
- Announced
- $4.1 billion, 1.4 million sq ft and 1,000 jobs (ABC11, June 2024)
- Timeline given
- Major phases complete between 2027 and 2029 (ABC11)
Spark LS manufacturing campus, Morrisville
- Announced
- Leases of more than 1.27 million sq ft to an undisclosed manufacturer, including a new 866,000 sq ft facility (owners' release, Dec 16, 2025)
- Timeline given
- Upfits from early 2026; new building delivered in 2027; full operations late 2028
Siemens Energy, Charlotte and Raleigh
- Announced
- $421 million and 500 jobs in North Carolina (Bisnow, Feb 4, 2026)
- Timeline given
- First Charlotte-made gas turbines expected to ship in two to three years (Bisnow)
| Project | Announced | Timeline given | In the permit record |
|---|---|---|---|
| JetZero aircraft plant, Piedmont Triad International Airport, Greensboro | $4.7 billion and 14,500 jobs (NC Commerce, June 2025 and June 15, 2026) | Groundbreaking June 15, 2026; mass grading for about a year from August or September, then major vertical construction (ENR) | No factory building permit yet. A $13 million office renovation at 725 N Regional Rd (issued Feb 10, 2026), where a July mechanical permit names Jet Zero. |
| Novo Nordisk fill-finish plant, Clayton | $4.1 billion, 1.4 million sq ft and 1,000 jobs (ABC11, June 2024) | Major phases complete between 2027 and 2029 (ABC11) | 86 permits at 2641 Powhatan Rd since October 2023, 71 with BE&K Building Group as applicant and 3 with Novo Nordisk Pharmaceutical. Eight in the last 12 months. |
| Spark LS manufacturing campus, Morrisville | Leases of more than 1.27 million sq ft to an undisclosed manufacturer, including a new 866,000 sq ft facility (owners' release, Dec 16, 2025) | Upfits from early 2026; new building delivered in 2027; full operations late 2028 | Origin 1 and Origin 2 upfits and a parking deck issued ($87.9 million); Origin 3 upfit in review ($158.5 million) |
| Siemens Energy, Charlotte and Raleigh | $421 million and 500 jobs in North Carolina (Bisnow, Feb 4, 2026) | First Charlotte-made gas turbines expected to ship in two to three years (Bisnow) | 59 permits with Siemens Energy as owner in Mecklenburg County since December 2025, $30.7 million declared, led by a $22.6 million main office building |
This could be upwards of 7 or 8 million cubic yards of earth to move.
JetZero's first work is the airport authority's. ENR reported that the authority's job is to deliver a construction-ready site to the edge of JetZero's leasehold, with Jacobs engineering the grading, and that JetZero had chosen its construction team but contracts were still being finalized. So the factory's building permits are still ahead. For site contractors, the grading is the job now. For everyone else, the trigger to watch is the first building permit for the campus.
Novo Nordisk is much further along. At 2641 Powhatan Rd, where Novo Nordisk Pharmaceutical and BE&K Building Group are applicants, Johnston County issued 66 of 86 permits between April 2024 and June 2025, and only eight in the last 12 months. That's what the record looks like once a project's main permits are in hand.
| Month | Permits issued |
|---|---|
| Q4 2023 | 5 |
| Q1 2024 | 7 |
| Q2 2024 | 11 |
| Q3 2024 | 28 |
| Q4 2024 | 4 |
| Q1 2025 | 14 |
| Q2 2025 | 9 |
| Q3 2025 | 0 |
| Q4 2025 | 1 |
| Q1 2026 | 6 |
| Q2 2026 | 0 |
| Q3 2026 | 1 |
What it means for each trade
- Site, grading and utility contractors: JetZero's site is being graded by the Piedmont Triad Airport Authority, which puts the earthwork at upwards of 7 or 8 million cubic yards. Everyone else's trigger comes after that.
- Electrical, mechanical and plumbing subs: the issued jobs are where trade permits come next. At Digital Realty's west Charlotte campus, each data hall suite came with its own electrical, mechanical and plumbing permits.
- Fire protection, finishes and specialty trades: Origin 3's $158.5 million upfit and RDU's Terminal 2 packages are the large interior jobs still in review. Their builders, Brasfield & Gorrie and Balfour Beatty, are already named.
- Suppliers and distributors: the general contractors named here repeat. Brasfield & Gorrie is on the Omni hotel, the Spark LS buildings and Digital Realty's Charlotte campus, so one account covers several of the state's largest jobs.
For a homeowner or a small sub, the biggest jobs matter less directly. They pull in labor across a region, so a crew booked on a hotel tower or a data hall isn't free for a remodel.
What this article doesn't cover
Large projects also need approvals that aren't building permits: rezonings, state air and water permits, and utility connections. Those aren't in the records TarSignal reads, and we haven't listed any we couldn't source. The statuses here are each office's own, as of November 3, 2026, and offices use different words for the same stage.
Where to find these permits in TarSignal
- Permit Search: search an address from the tables to see every permit filed there, with the builder, the trade contractors and the status.
- Project Alerts: get new permits in your trade and counties by email each morning, sorted Hot, Warm and Cold, so the next big filing reaches you the day it's posted.
- Permit Analytics: see which offices and categories are moving, to spot the next cluster of big jobs.
How these numbers were counted
We took every permit with a declared value of $20 million or more filed November 1, 2025, to October 31, 2026, in the offices TarSignal reads, by filing date where the office records one and issue date where it doesn't. We left out Brunswick, Durham and New Hanover, which compute some values from fixed cost tables, and Johnston County permits we couldn't tie to a named project, because that county publishes no work description. We grouped permits into projects by address, owner of record and project name, and listed each project's largest permit.
- Digital Realty's $494.4 million is the total on 65 permits through October 23, 2026, not counting revisions, from our article on the campus's construction phases.
- At 2641 Powhatan Rd, the same value often appears on several of Johnston County's permits, so we count permits there and don't add up their values.
- Siemens Energy's 59 permits are those with Siemens Energy as owner of record; the $30.7 million is their declared total.
- We name an occupant only where the permit, the owner of record or a cited source does. The Origin buildings are Spark LS's own names for its buildings.
- Announced figures are the companies' and agencies' own, from the sources below. We haven't estimated anything beyond them.
Sources
- TarSignal: Greensboro's Road to 10,000: what the building permits show so far
- TarSignal: North Carolina ends parking minimums on January 1, 2027: what a parking deck costs in NC permits
- NC Commerce: Governor Stein celebrates JetZero groundbreaking (June 15, 2026)
- NC Commerce: JetZero selects North Carolina (June 12, 2025)
- ENR: JetZero starts work on $4.7B Greensboro, N.C., aircraft campus (June 18, 2026)
- ABC11: Novo Nordisk plans $4.1B investment in Johnston County (June 2024)
- Manufacturing Dive: BE&K to build $4.1B Novo Nordisk facility in North Carolina (July 11, 2024)
- Trinity Capital Advisors: Spark LS secures largest U.S. manufacturing lease in 2025 (Dec 16, 2025)
- Bisnow: Siemens Energy finalizes $421M expansion plans in North Carolina (Feb 4, 2026)
- ABC11: Construction starts on new downtown Raleigh Omni Hotel (Feb 17, 2026)
- ABC11: RDU begins $2.5 billion expansion with temporary wall at Terminal 2
- TarSignal: Data center construction phases, from the permit record: how Digital Realty's Charlotte campus is being built
- TarSignal: How long building permits take in North Carolina, by office
- TarSignal Permit Search
- TarSignal Project Alerts