Foundation and concrete permits in Cary, NC
65 foundation and concrete permits were filed in Cary in the last 12 months, and 4 in the last 30 days. That's 4% of the foundation and concrete permits filed at the North Carolina offices we read, and 2% of all Cary's permits.
The Town of Cary issues building permits inside town limits. More on all building permits in Cary and foundation and concrete permits at every office we read.
How to find foundation repair and concrete leads in Cary from these permits, free →
- Last 12 months
- 65
- Last 90 days
- 27
- Last 30 days
- 4
- Average declared value
- $37K
- across 65 permits with a value
Does this work need a permit in Cary?
Yes, for structural work. Foundation repair is load-bearing work; a slab or patio that carries nothing usually isn't. That's North Carolina law (G.S. 160D-1110), the same in every permit office — the statewide guide explains what it means for the permit records.
By month
Who's pulling foundation and concrete permits in Cary
Ranked by permits in the last 12 months.
| Contractor | Last 12 months | Last 90 days |
|---|---|---|
| Groundworks North Carolina (Tar Heel Basement Systems) | 17 | 9 |
| Foundation Pro NC (Ram Jack) | 6 | 3 |
| Carolina Basement Systems, LLC | 6 | 2 |
| Triangle Reconstruction Compan | 5 | 1 |
| Atlantic Foundation & Repair LLC | 5 | 1 |
| Calvin Construction Service, L | 4 | 0 |
| Foundation Xperts, LLC | 3 | 1 |
| Advanced Structural Repair, Ll | 2 | 2 |
| Bolin Enterprises, Inc. | 2 | 1 |
| The Robins & Morton Group | 2 | 0 |
| Coastal Crawl Space Repair LLC | 1 | 0 |
| Lindsley Waterproofing | 1 | 0 |
Recent permits
A sample from 30 or more days ago. Permit Search and the daily email have them as they're filed.
| Address | Type | Value | Status | Date |
|---|---|---|---|---|
| 305 PEACHTREE POINT CTCary 27513 | Fence / Retaining WallB417 | $79K | Issued | |
| 1309 REDBUD CIRCary 27519 | OtherB434 | $21K | Issued | |
| 110 W DUTTON CTCary 27513 | Alteration / RemodelB434 | $46K | Issued | |
| 206 HALPEN DRCary 27513 | Alteration / RemodelB434 | $5,665 | Issued | |
| 309 POTOMAC GROVE PLCary 27519 | Alteration / RemodelB434 | $26K | Issued |
4 more permits filed in Cary in the last 30 days
Pro names the contractor on most, with a phone number on most.
Pro is $199/mo founding rate (ends Dec 31, 2026), then $299/mo.
Foundation and concrete permits in Cary: common questions
- How many foundation and concrete permits are filed in Cary?
- 65 in the last 12 months and 4 in the last 30 days — 4% of the foundation and concrete permits filed at all the North Carolina offices we read. The busiest ZIP codes were 27513 (24), 27519 (20) and 27518 (9). The Town of Cary issues building permits inside town limits.
- Who pulls the most foundation and concrete permits in Cary?
- By permits in the last 12 months: Groundworks North Carolina (Tar Heel Basement Systems), Foundation Pro NC (Ram Jack) and Carolina Basement Systems, LLC. The table above has the most active twelve, each linked to its own page where it has one.
- Does foundation or concrete work need a permit in Cary?
- Yes, for structural work. Foundation repair is load-bearing work; a slab or patio that carries nothing usually isn't. That's North Carolina law (G.S. 160D-1110), so it's the same in every permit office in the state.
Related
Foundation and concrete permits in other places
- Charlotte & Mecklenburg County419
- Raleigh348
- Durham249
- Wake County153
- Brunswick County148
- Greensboro120
- Wilmington & New Hanover County102
- Asheville88
- Gaston County77
Other trades in Cary
Get the permits, not just the totals
Permit Search has every foundation and concrete permit filed in Cary, with the contractor where the record names one. Or get new permits in your ZIP codes emailed to you, free.
TarSignal Pro: new permits the day they're filed
Daily alerts across every metro, with the contractor's phone and email where the permit lists them, plus CSV export. $199/mo founding rate (ends Dec 31, 2026), then $299/mo.
Source: TarSignal, from North Carolina public building permit records, data through October 6, 2026. Refreshed nightly. Counts include every permit type a jurisdiction files — trade permits (electrical, plumbing, mechanical) as well as building permits — so one project can appear more than once. Values are what the applicant declared, where the jurisdiction records one. We keep improving how we collect each office's permits, so a count that steps up suddenly usually means more complete records, not more construction.
