Deck and addition permits in Cary, NC
207 deck, porch and addition permits were filed in Cary in the last 12 months, and 10 in the last 30 days. That's 2% of the deck, porch and addition permits filed at the North Carolina offices we read, and 6% of all Cary's permits.
The Town of Cary issues building permits inside town limits. More on all building permits in Cary and deck, porch and addition permits at every office we read.
How to find deck and addition leads in Cary from these permits, free →
- Last 12 months
- 207
- Last 90 days
- 93
- Last 30 days
- 10
- Average declared value
- $90K
- across 203 permits with a value
Does this work need a permit in Cary?
Yes. A new deck, porch or addition is load-bearing work; replacing boards, railings or treads isn't. That's North Carolina law (G.S. 160D-1110), the same in every permit office — the statewide guide explains what it means for the permit records.
By month
Who's pulling deck, porch and addition permits in Cary
Ranked by permits in the last 12 months.
| Contractor | Last 12 months | Last 90 days |
|---|---|---|
| Tripoint Decks, LLC | 25 | 16 |
| Jm Decks And Fences | 11 | 4 |
| Cardinal Construction Of The | 10 | 5 |
| Grove Hill Enterprises Inc. | 6 | 4 |
| Decks By All Means | 4 | 3 |
| The Screen Porch And Patio Co | 3 | 3 |
| Sierra Structures, Inc. | 3 | 2 |
| Omni Design Build, Inc. | 3 | 0 |
| Pro-Built Construction Of NC | 3 | 1 |
| Faulkner Construction, LLC, T | 2 | 0 |
| Freys Building & Remodeling Co | 2 | 0 |
| Downsize Construction And Cons | 2 | 2 |
Recent permits
A sample from 30 or more days ago. Permit Search and the daily email have them as they're filed.
| Address | Type | Value | Status | Date |
|---|---|---|---|---|
| 102 ASHLEY GLEN DRCary 27513 | Deck / PorchB434 | $80K | Issued | |
| 105 MAINSAIL DRCary 27511 | Deck / PorchB434 | $33K | Issued | |
| 113 CHIMNEY RISE DRCary 27511 | Deck / PorchB434 | $75K | Issued | |
| 4921 MASHPEE LNApex 27539 | Deck / PorchB417 | $15K | Issued | |
| 156 RIVULET CTCary 27519 | Deck / PorchB434 | $38K | Issued |
10 more permits filed in Cary in the last 30 days
Pro names the contractor on most, with a phone number on most.
Pro is $199/mo founding rate (ends Dec 31, 2026), then $299/mo.
Deck and addition permits in Cary: common questions
- How many deck, porch and addition permits are filed in Cary?
- 207 in the last 12 months and 10 in the last 30 days — 2% of the deck, porch and addition permits filed at all the North Carolina offices we read. The busiest ZIP codes were 27519 (65), 27513 (56) and 27511 (44). The Town of Cary issues building permits inside town limits.
- Who pulls the most deck, porch and addition permits in Cary?
- By permits in the last 12 months: Tripoint Decks, LLC, Jm Decks And Fences and Cardinal Construction Of The. The table above has the most active twelve, each linked to its own page where it has one.
- Does a deck, porch or addition need a permit in Cary?
- Yes. A new deck, porch or addition is load-bearing work; replacing boards, railings or treads isn't. That's North Carolina law (G.S. 160D-1110), so it's the same in every permit office in the state.
Related
Deck and addition permits in other places
- Charlotte & Mecklenburg County1,787
- Wake County952
- Raleigh884
- Cabarrus County722
- Brunswick County590
- Durham535
- Wilmington & New Hanover County527
- Johnston County386
- Greensboro383
- Gaston County309
- Union County281
- High Point234
- Asheville233
- Guilford County216
- Cumberland County101
- Alamance County101
- Fuquay-Varina62
Other trades in Cary
Get the permits, not just the totals
Permit Search has every deck, porch and addition permit filed in Cary, with the contractor where the record names one. Or get new permits in your ZIP codes emailed to you, free.
TarSignal Pro: new permits the day they're filed
Daily alerts across every metro, with the contractor's phone and email where the permit lists them, plus CSV export. $199/mo founding rate (ends Dec 31, 2026), then $299/mo.
Source: TarSignal, from North Carolina public building permit records, data through October 21, 2026. Refreshed nightly. Counts include every permit type a jurisdiction files — trade permits (electrical, plumbing, mechanical) as well as building permits — so one project can appear more than once. Values are what the applicant declared, where the jurisdiction records one. We keep improving how we collect each office's permits, so a count that steps up suddenly usually means more complete records, not more construction.
