NEWPermit Search is live — three years of North Carolina permits, free to start. Search permits →

Electrical permits in Cary, NC

538 electrical permits were filed in Cary in the last 12 months, and 125 in the last 30 days. That's 1% of the electrical permits filed at the North Carolina offices we read, and 14% of all Cary's permits.

The Town of Cary issues building permits inside town limits. More on all building permits in Cary and electrical permits at every office we read.

How to find electrical leads in Cary from these permits, free →

Last 12 months
538
Last 90 days
407
Last 30 days
125
Average declared value
$6,922
across 535 permits with a value

Does this work need a permit in Cary?

Yes, mostly. Adding, replacing or changing electrical equipment needs one; a like-for-like fixture or outlet swap doesn't. That's North Carolina law (G.S. 160D-1110), the same in every permit office — the statewide guide explains what it means for the permit records.

By month

JulAugSepOctNov
Permits by the month they were filed or issued. Nov 2026 is still in progress. Earlier months are left off: the public records we read are incomplete before Jul 2026.

Where in Cary

The ZIP codes with the most electrical permits. Each linked ZIP has its own page.

Cary 484 · Apex 38 · Raleigh 10 · Morrisville 6

Who's pulling electrical permits in Cary

Ranked by permits in the last 12 months.

ContractorLast 12 monthsLast 90 days
Triad Electrical Services7553
8MSolar3429
Triangle Electric And Ev Solut2621
NC Solar Now, Inc.1813
Cockrell's Electrical Services158
Touchstone Electric Rdu1410
NC Express Services LLC1411
Dawson's Electric Inc.1110
Harris Electrical Contractors1010
Alternate Current Solutions85
One Call Electric NC LLC86
Green Wave Electrical Contract86

Recent permits

A sample from 30 or more days ago. Permit Search and the daily email have them as they're filed.

AddressTypeValueStatusDate
106 COUGAR CTCary 27513ElectricalE104$4,900Issued
212 COATBRIDGE CIRCary 27511ElectricalE104$6,000Issued
214 PIPERWOOD DRCary 27518ElectricalEVSE$1,240Issued
110 EARHART CIRCary 27511ElectricalM108$2,000Issued
828 BRISTOL BRIDGE DRCary 27519ElectricalEVSE$650Issued

125 more permits filed in Cary in the last 30 days

Pro names the contractor on most, with a phone number on most.

Pro is $199/mo founding rate (ends Dec 31, 2026), then $299/mo.

See them with TarSignal Pro

Electrical permits in Cary: common questions

How many electrical permits are filed in Cary?
538 in the last 12 months and 125 in the last 30 days — 1% of the electrical permits filed at all the North Carolina offices we read. The busiest ZIP codes were 27519 (231), 27513 (130) and 27511 (77). The Town of Cary issues building permits inside town limits.
Who pulls the most electrical permits in Cary?
By permits in the last 12 months: Triad Electrical Services, 8MSolar and Triangle Electric And Ev Solut. The table above has the most active twelve, each linked to its own page where it has one.
Does electrical work need a permit in Cary?
Yes, mostly. Adding, replacing or changing electrical equipment needs one; a like-for-like fixture or outlet swap doesn't. That's North Carolina law (G.S. 160D-1110), so it's the same in every permit office in the state.

Get the permits, not just the totals

Permit Search has every electrical permit filed in Cary, with the contractor where the record names one. Or get new permits in your ZIP codes emailed to you, free.

TarSignal Pro: new permits the day they're filed

Daily alerts across every metro, with the contractor's phone and email where the permit lists them, plus CSV export. $199/mo founding rate (ends Dec 31, 2026), then $299/mo.

Get Pro

Source: TarSignal, from North Carolina public building permit records, data through October 28, 2026. Refreshed nightly. Counts include every permit type a jurisdiction files — trade permits (electrical, plumbing, mechanical) as well as building permits — so one project can appear more than once. Values are what the applicant declared, where the jurisdiction records one. We keep improving how we collect each office's permits, so a count that steps up suddenly usually means more complete records, not more construction.