Electrical permits in Asheville, NC
243 electrical permits were filed in Asheville in the last 12 months, and 41 in the last 30 days. That's 0% of the electrical permits filed at the North Carolina offices we read, and 10% of all Asheville's permits.
The City of Asheville issues building permits inside city limits. The rest of Buncombe County isn't covered yet. More on all building permits in Asheville and electrical permits at every office we read.
How to find electrical leads in Asheville from these permits, free →
- Last 12 months
- 243
- Last 90 days
- 112
- Last 30 days
- 41
- Share of NC
- 0%
- of the electrical permits we read statewide
Does this work need a permit in Asheville?
Yes, mostly. Adding, replacing or changing electrical equipment needs one; a like-for-like fixture or outlet swap doesn't. That's North Carolina law (G.S. 160D-1110), the same in every permit office — the statewide guide explains what it means for the permit records.
By month
Who's pulling electrical permits in Asheville
Ranked by permits in the last 12 months.
| Contractor | Last 12 months | Last 90 days |
|---|---|---|
| Sugar Hollow Solar, Inc | 18 | 14 |
| Harrington Electric Inc | 9 | 1 |
| Rhino Renewables & Electric LLC | 9 | 7 |
| Grigg Electric Co. Inc. | 4 | 0 |
| Jes Columbia, LLC Aka Mount Valley Foundation Services | 4 | 1 |
| A-American Electric | 4 | 1 |
| Concept Lighting & Electric LLC | 4 | 3 |
| City Of Asheville Trades Worker , Master (Facility Maintenance) | 4 | 3 |
| Premier Plumbing Of Wnc (DBA) | 3 | 1 |
| The Hoff Group LLC | 3 | 2 |
| Phil Jacques Plumbing | 3 | 1 |
| Touchstone Electric CLT | 3 | 2 |
Recent permits
A sample from 30 or more days ago. Permit Search and the daily email have them as they're filed.
| Address | Type | Value | Status | Date |
|---|---|---|---|---|
| 383 STRATFORD RDAsheville 28804 | ElectricalRes: Solar | — | Issued | |
| 247 HI ALTA AVEAsheville 28806 | ElectricalRes: Alterations | — | Issued | |
| 50 BALLANTREE DRAsheville 28803 | ElectricalRes: Alterations | — | Issued | |
| 39 BLUE RIDGE AVEAsheville 28806 | ElectricalRes: Solar | — | Issued | |
| 7 ALL SOULS CRESAsheville 28803 | ElectricalCom: Alterations | — | Issued |
41 more permits filed in Asheville in the last 30 days
Pro names the contractor on most, with a phone number on most.
Pro is $199/mo founding rate (ends Dec 31, 2026), then $299/mo.
Electrical permits in Asheville: common questions
- How many electrical permits are filed in Asheville?
- 243 in the last 12 months and 41 in the last 30 days — 0% of the electrical permits filed at all the North Carolina offices we read. The busiest ZIP codes were 28803 (64), 28801 (58) and 28806 (49). The City of Asheville issues building permits inside city limits. The rest of Buncombe County isn't covered yet.
- Who pulls the most electrical permits in Asheville?
- By permits in the last 12 months: Sugar Hollow Solar, Inc, Harrington Electric Inc and Rhino Renewables & Electric LLC. The table above has the most active twelve, each linked to its own page where it has one.
- Does electrical work need a permit in Asheville?
- Yes, mostly. Adding, replacing or changing electrical equipment needs one; a like-for-like fixture or outlet swap doesn't. That's North Carolina law (G.S. 160D-1110), so it's the same in every permit office in the state.
Related
Electrical permits in other places
- Charlotte & Mecklenburg County43,556
- Brunswick County8,929
- Greensboro8,057
- Cabarrus County7,788
- Wake County2,737
- Gaston County2,705
- Onslow County1,393
- Guilford County1,155
- Wilmington & New Hanover County1,144
- High Point1,050
- Alamance County902
- Cary538
- Cumberland County524
- Union County290
- Johnston County284
- Durham282
- Morrisville221
- Raleigh190
- Fuquay-Varina100
- Apex57
- Garner50
Other trades in Asheville
Get the permits, not just the totals
Permit Search has every electrical permit filed in Asheville, with the contractor where the record names one. Or get new permits in your ZIP codes emailed to you, free.
TarSignal Pro: new permits the day they're filed
Daily alerts across every metro, with the contractor's phone and email where the permit lists them, plus CSV export. $199/mo founding rate (ends Dec 31, 2026), then $299/mo.
Source: TarSignal, from North Carolina public building permit records, data through October 30, 2026. Refreshed nightly. Counts include every permit type a jurisdiction files — trade permits (electrical, plumbing, mechanical) as well as building permits — so one project can appear more than once. Values are what the applicant declared, where the jurisdiction records one. We keep improving how we collect each office's permits, so a count that steps up suddenly usually means more complete records, not more construction.
