NEWPermit Search is live — three years of North Carolina permits, free to start. Search permits →
Guide7 min read

Temporary certificate of occupancy vs. final CO in North Carolina: what a TCO allows, how long it lasts and who uses them

A TCO lets a building be used before its final certificate. NC's rule, what Mecklenburg and Guilford County require, what happens when one expires, and why half of Durham's new apartment buildings are still on one.

A temporary certificate of occupancy, or TCO, lets people use all or part of a building before the final certificate is issued, for a stated period, when the inspector finds it can be occupied safely. North Carolina's law allows it in one sentence (G.S. 160D-1116(b)); each inspections office decides how to grant it, for how long and for what fee. In practice TCOs are a tool for apartment buildings and commercial spaces, not houses: in Durham, half of the apartment buildings permitted since 2021 still show a conditional CO as their latest step, against one house in a thousand. This guide covers the difference between a TCO and a final CO, what offices require, how long a TCO lasts, and what happens when it runs out.

50%

of Durham apartment buildings (5+ units) permitted since 2021 that reached a certificate still show a conditional CO

0.1%

of Durham single-family houses in the same years: 20 of 13,713

176

open TCOs in Mecklenburg County, almost all commercial; none on a recorded house

$90

Mecklenburg's fee for a first TCO, per open permit; $55 to renew

What is a temporary certificate of occupancy?

Permission from the inspections department to occupy all or part of a building for a stated period before it's finished, when the inspector finds that it can be occupied safely. The permit holder asks for it, and the State Building Code's conditions have to be met (G.S. 160D-1116(b)). Some offices call it a temporary CO, TCO, or conditional CO.

What is the difference between a temporary certificate of occupancy and a certificate of occupancy?

A certificate of occupancy (in the statute, a certificate of compliance) comes after the final inspection, when all the work under the permit complies with the code and the permit, and it doesn't expire. A temporary certificate comes before that, covers a stated period and sometimes only part of the building, and the final inspection and certificate are still required.

How long is a temporary certificate of occupancy good for in NC?

There's no statewide length. The statute says only "for a stated period", so each office sets it. Mecklenburg County prints the expiration date on a placard posted at the building and charges $55 per open permit to renew.

Can you live in a house with a temporary certificate of occupancy?

Yes, within its terms: it authorizes occupancy for its stated period and for the part of the building it names. What you can't do is occupy a new or altered building with neither a final nor a temporary certificate; that's a Class 1 misdemeanor for the owner or anyone who lets someone move in (G.S. 160D-1116(c)). Temporary electric service doesn't count as permission to occupy.

Can you close on a house with a temporary certificate of occupancy?

The law lets the buyer move in under a valid TCO, but whether a lender will fund the loan or the purchase contract allows closing on one is between the buyer, the seller and the lender, so ask before the date is set. It's uncommon: in Durham, one house in a thousand permitted since 2021 still shows a conditional CO.

What happens when a TCO expires?

Occupancy is no longer authorized until it's renewed or the final certificate is issued. Mecklenburg County also bars a contractor whose TCO has been expired for more than 30 days from getting any new TCO until the expired one is renewed or completed.

Temporary vs. final certificate of occupancy

Final certificate (CO)Temporary certificate (TCO)
When it's issuedAfter the final inspection, when the work complies with the code and the permitBefore completion, when the inspector finds the building can be occupied safely
What it coversThe whole building or work under the permitAll of the building, or only the parts it names
How long it lastsDoesn't expireA stated period set by the office, then renewed or replaced by the final
Who asks for itIssued after the final inspection passesThe permit holder requests it; Mecklenburg allows only general contractors with an account
What's left to doNothing under that permitThe remaining work, its inspections and the final certificate
Final and temporary certificates of occupancy in North Carolina (G.S. 160D-1116)

What offices require for a TCO

The statute leaves the details to each office. Two that publish theirs:

  • Mecklenburg County: every building, electrical, mechanical and plumbing permit on the project, and every agency hold, must be finaled, released or approved for the TCO. The fee is $90 per open permit for a first TCO and $55 per open permit to renew, plus $55 for each renewal inspection, and only general contractors with an account can get one. A placard showing the TCO's conditions and expiration date must stay posted until the CO is issued. A contractor with a TCO expired more than 30 days can't get another until it's renewed or completed.
  • Guilford County: sprinkler, smoke detection and fire alarm systems, where the building has them, must be working and tested and verified by the fire inspector; the general contractor is responsible for any re-inspection fees; and an application that hasn't produced a TCO within 90 days is voided.
  • Durham City-County: in its records a temporary certificate appears as its own status, Cond. CO Issued (a conditional CO), with the date it was signed off.

One limit applies everywhere. An office can't withhold a building permit or certificate of occupancy to force work on a different property unless there's a public safety issue, and landscaping on house lots and in subdivision common areas, and subdivision street lights, don't count as one; the developer files an affidavit saying when that work will be finished instead (G.S. 160D-1110(h)). That's one reason houses rarely need a TCO.

Who uses TCOs: what Durham's records show

Durham records the date each certificate was signed off and whether it was a final or a conditional CO, so its permits show which buildings end up waiting on a temporary certificate. Of the 23,814 permits issued since 2021 that have reached either, 368 (1.5%) still show a conditional CO as their latest step. Nearly all of them are apartments and commercial buildings.

Building typeReached a certificateStill at a conditional COShareMedian days, permit to final CO
Apartment buildings (5+ units)23211550%273
Commercial (non-residential)3,1552026.4%160
Duplexes28131.1%298
Townhouses5,727180.3%199
Single-family houses13,713200.1%149
Accessory dwellings and structures63500%101 to 244
All Durham permits23,8143681.5%171
Durham permits issued since January 2021 that reached a certificate: how many still show a conditional CO, and the median days from permit to a final CO, by building type

That lines up with how those buildings are built: an apartment complex is often finished and leased in stages, and a commercial tenant may want to open its space while work elsewhere in the building goes on. A house is usually finished all at once.

When a temporary certificate becomes permanent in practice

A TCO is supposed to end in a final certificate, but the records show many that haven't. In Durham, 267 of the 368 conditional COs, 73%, were signed off more than a year ago and still have no final. In Mecklenburg County, 176 permits show TCO Issued today: 145 are commercial upfits, additions and repairs, six are apartment buildings and none are houses. The typical permit among them was issued about five months ago, and 35 were issued more than a year ago. For a buyer, tenant or lender, a TCO that has been renewed for a year is worth asking about: something on the project still hasn't passed its final inspection.

For buyers, owners and contractors

  • Buyers and tenants: check whether the building has a final or a temporary certificate, and if it's temporary, when it expires and what's left. The permit record at the office, or Permit Search, shows the status.
  • Owners: occupying without either certificate is a misdemeanor, and so is letting a tenant move in early; temporary power from the utility isn't a substitute.
  • Contractors: a TCO needs every trade on the project finaled or signed off for it, the life-safety systems working, and a renewal before it lapses. In Mecklenburg an expired one blocks your next.

How the numbers were counted

Durham: permits in TarSignal's copy of the City-County records issued from January 1, 2021, whose status is CO Issued or Cond. CO Issued and which carry a certificate sign-off date, grouped by the building type Durham records. A status is the latest step, so a building that had a conditional CO and later got its final counts as final; the share at a conditional CO is the buildings still waiting. Mecklenburg: permits whose status was TCO Issued on October 24, 2026, by the county's building use code and issue date. Rules are as published in G.S. 160D-1110 and 160D-1116, on Mecklenburg County's TCO page and on Guilford County's TCO application in October 2026; other offices set their own terms.

Share this article

Get permits like these first

Free for one ZIP in any metro we cover. No credit card required.

Get my free project list