Resources
Notes from the NC permit desk
Short, data-backed write-ups on North Carolina permit volume and how trades across every metro we cover turn public filings into booked work.
Data center construction phases, from the permit record: how Digital Realty's Charlotte campus is being built
Charlotte has paused new data centers until October 2027, but the ones already approved keep building. Mecklenburg County's permits show the order a $494 million campus goes up in: walls and substation power first, then the shell, then eight data halls in nine weeks. They also name the contractor at each stage.
Read the post →Whole-house generator permits in NC rose 64% in the Piedmont after Winter Storm Fern
January's ice storm cut power to about 100,000 Duke Energy customers in North Carolina, most for less than a day. In the next two months, twice as many Piedmont homes filed for a standby generator as a year before, and the pace has stayed high since. At the coast, generator permits fell. From the permit records of six NC offices.
Read the post →How subcontractors find work in building permits: three NC examples with real numbers
Worked examples on permits filed this summer: finding small builders in Charlotte, building a general contractor bid list from tenant upfits, and sending a supplier's reps to the busiest ZIP codes.
Read the post →Triangle building permits compared: Raleigh, Wake County, Durham, Cary and the towns
Which office issues your permit, where each one's portal is, how they handle trade work, and how fast and busy each is, from the records of ten Triangle permit offices.
Read the post →Temporary certificate of occupancy vs. final CO in North Carolina: what a TCO allows, how long it lasts and who uses them
A TCO lets a building be used before its final certificate. NC's rule, what Mecklenburg and Guilford County require, what happens when one expires, and why half of Durham's new apartment buildings are still on one.
Read the post →EV charger and heat pump permits in North Carolina: do you need one, who can install it, and what it costs
Both need a permit at any price. What the license and code rules require, the R-410A question, and what 8,000 permits show about circuit sizes, job costs and how fast offices issue them.
Read the post →Can a homeowner pull a permit in North Carolina? Doing your own building, electrical, plumbing and HVAC work
Yes, on a home you own and live in. What each trade's licensing law allows, what permit offices ask homeowners for, when a rental or flip needs licensed contractors, and which jobs homeowners actually permit.
Read the post →Is new home construction slowing down in North Carolina? Where 2026 permits fell, and where they didn't.
Nationally, new-home permits slipped again in September. In North Carolina the slowdown is real but local: permits for new houses fell 19% last quarter in Johnston, Durham and Gaston counties, and rose 17% in Brunswick, Wake, Onslow and Greensboro. County by county, from the permit offices TarSignal reads.
Read the post →The solar tax credit ended. Here's what North Carolina's permits did next.
Rooftop solar rushed to beat the December 31 deadline, then fell 40 percent. Nearly half of new systems now come with a battery. Heat pumps and EV chargers kept growing as if nothing had changed. Month by month, from the permit records of eight NC offices.
Read the post →Greensboro September 2026: Largest Building Permit Filings by Declared Cost
The list shows the ten Greensboro permits with declared construction costs totaling $41.0 million, led by a $12.5 million Sam’s Club remodel.
Read the post →New posts go out with the weekly list. Want a topic covered? Email support@tarsignal.com.
Get the daily list
Free for the areas you work, in any metro we cover. No credit card required.
Get my free project list